JACKSON VALLEY IRRIGATION DISTRICT TREATED WATER SYSTEM

Installed approximately 17 miles of 8”, 6” and 4” distribution system line, a 2nd water treatment module at existing water treatment plant, a 200,000 gallon water tank and appurtenances, water services, stream crossings, connection to existing facilities, metering equipment, and miscellaneous water system appurtenances.

UC DAVIS EMERGENCY GENERATOR, PHASE 1

Installation, relocation and removal of both above ground and underground electrical and hydronic utilities for an owner-provided 3mw generator, switchgear and fuel storage tank. Structural concrete equipment pads, hardscape and landscape features. Site lighting and security fencing.


Owner: University California, Davis

Date of Completion: 3/4/19

Contract Amount: $621,452.00

Contact: David Brooks (916) 734-0221


NEVADA IRRIGATION DISTRICT RESERVOIR SEDIMENT REMOVAL

Remove sediment and temporary stockpiled sediment from the Loma Rica Reservoir. Coordinate with airport manager to ensure safety of the public, flight activities and plane taxiing.


Owner: Nevada Irrigation District

Date of Completion: November 2018

Contract Amount: $337,840.39

Contact: Adrian Schneider (530) 271-6839

SACRAMENTO INTERNATIONAL AIRPORT NORTH AREA MAINTENANCE AND STORAGE FACILITY

Erect a 20,000 square foot metal building with 8 roll up doors, including all grading, drainage, foundation, electrical, and lighting. Relocate existing regeneration station, including the installation of a ¾” copper compressed air supply from the building to the regen unit and connection to the existing unit.


Date of Completion: June 2018

Contract Amount: $1,087,546.98

Contact: Melody Busk (916) 874-0755

PENN VALLEY DUAL FORCE MAIN

Furnish all labor, materials, tools, and equipment for construction of a new lift station located in the Penn Valley community, dual 6-inch force mains from the lift station to the Lake Wildwood wastewater treatment plant (LWW WWTP), an energy dissipator manhole, a new influent sewer at the LWW WWTP, a new grit removal system at the LWW WWTP, a new headworks odor control system at the LWW WWTP and required site grading, site piping, electrical improvements, instrumentation and control improvements, miscellaneous site and facility improvements, mobilization/demobilization, traffic control, sheeting/shoring/bracing, stormwater SWPPP & implementation, and all associated work.


Penn Valley Dual Sewer Force Main

Owner: Nevada County Sanitation District No. 1

Date of Completion: April 24, 2018

Contract Amount: $7,720,033.70

Contact: Brad Torres (530) 265-7103

GAS STORAGE FACILITY

Consolidate transported bottled Medical Gas into a single storage facility known as the Bulk Oxygen storage facility. Modify one existing canopy and add two others. Each canopy area required new support post foundations, new steel structures for bottle support and to support the new canopies. add additional lighting.


Owner: University of California, Davis

Date of Completion: March 8, 2018

Contract Amount: $245,537.00

Contact: Jim Davis (916) 734-4702

NEVADA UNION HIGH SCHOOL BASEBALL SCOREBOARD

Provide labor and materials to install owner supplied scoreboard, including the following: Remove existing scoreboard, setup and pour footings/mounts, provide and install new columns, and install new scoreboard.


Nevada Union High School Baseball Scoreboard

Owner: Nevada Joint Union District

Date of Completion: May 2017

Contract Amount: $17,348.00

RUTLAND WELL N39

Equip a municipal groundwater well including new: pump, motor, building, standby generator, flow meter, perimeter fence, paving, concrete, landscaping, piping, power distribution equipment, programmable logic controller, SCADA improvements, and other items as required for a complete and operable facility.


Owner: Sacramento Suburban Water District

Date of Completion: December 2016

Contract Amount: $2,156,805.61

Contact: Jeff Lodge (916) 341-7760

ZONE 1 WELL UPGRADE & EXPANSION PROJECT

Construction of a new well at Tinker Road and rehabilitation of an existing well along Cincinnati Avenue, both west of Highway 65.


Zone 1 Well Upgrade & Expansion Project

Owner: Placer County Water Agency

Date of Completion: October 20, 2016

Contract Amount: $1,986,058.00

Contact: Ken Stram (916) 826-3369

DISCOVERY BAY PUMP STATION G REHABILITATION

Furnish all labor, materials, tools, transportation, insurance and services to provide electrical modifications to existing pump station.


Discovery Bay Pump Station G Rehabilitation

Owner: Town of Discovery Bay Community Service District

Date of Completion: April 15, 2016

Contract Amount: $65,500.00

Contact: Virgil Koehne (925) 634-1733

McLaughlin Reserve Improvements, Rebid Electrical Service Modifications

Provide all labor, materials, tools, transportation, insurance and services to upgrade site electrical. Install new 480 switchgear and remove 5 KB system to make existing building more energy efficient. Worked closely with UC Davis staff to bring existing system back online with the new voltage.


McLaughlin Reserve Improvements, Rebid Electrical Service Modifications

Owner: University of California, Davis

Date of Completion: March 18, 2016

Contract Amount: $140,913.77

Contact: Albert Vallecillo (530) 219-1612

BRUNSWICK ROAD & LOMA RICA DRIVE INTERSECTION IMPROVEMENTS

Address roadway safety enhancements with the placement of traffic signal and lighting. Including high surface roadway treatment, raised and recessed thermoplastic striping, rumble strips, pavement markers, raised and recessed pavement markings.


Brunswick Road & Loma Rica Drive Intersection Improvements

Owner: County of Nevada, Department of Public Works

Date of Completion: October 1, 2015

Contract Amount: $935,293.12

Contact: Joshua Pack (530) 265-7059

CALTRANS ELECTRIC VEHICLE CHARGING STATION INFRASTRUCTURE

Provide the installation of an electric vehicle charging station and provide all labor, tools, equipment, vehicles, and incidentals necessary to install an electric vehicle charging station infrastructure at the Yuba City Construction Office in Sutter County, as well as at the Special Crews Maintenance Facility in Yuba


CalTrans Electric Vehicle Charging Station Infrastructures

Owner: California Department of Transportation

Date of Completion: September 1, 2015

Contract Amount: $30,850.00

Contact: Joel Robinson (916) 227-6025

ELK GROVE WATER DISTRICT SCADA IMPROVEMENT PROJECT

New SCADA improvement infrastructure project to advance communication between the water plant and surrounding well sites. Installation consisted of one, 60 foot radio tower and three, 40 foot antenna poles.


Elk Grove Water District SCADA Improvement Project

Owner: Florin Resource Conservation District

Date of Completion: July 15, 2015

Contract Amount: $111,500.00

Contact: Bruce Kamilos (916) 585-9385

Workcontinue to page 7Back to page 5

Koch & Koch, Inc.

13084 John Bauer Ave Grass Valley, CA 95945

(530) 432-4000

Copyright © 2024 Koch & Koch, Inc. - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept