1. Includes approximately 10,575 feet of 12-inch sewer force main and appurtenances, approximately 130 feet of 6-inch through 10-inch gravity sewer pipe and appurtenances, approximately 1,330 feet of 24-inch water main and appurtenances, approximately 3,330 feet of 2-inch through 6-inch water pipe and appurtenances, compensating flood plain excavation, joint trench conduit from SMUD riser pole to the transformer including pad and secondary conduits, maintenance roads and associated roadside ditches, and drainage best management practices and drainage pipelines.
2. Construct and commission Riolo Vineyard Sewer Lift Station, including water and fixtures, underground mechanical pump systems, valving and yard piping, wet well, electrical and instrumentation, site work, site drainage and miscellaneous work involved with startup, testing, and operation of the station
Riolo Vineyard Sewer Lift Station and Lift Station Infrastructure Project
Owner: JEN California 8, LLC
Date of Completion: Jan 2022
Contract Amount: $7,500,000.00
Contact: Bob Minturn (916) 257-4065
Upgrade storm water pumping plants in various locations in Tulare, Fresno, and Madera Counties
Caltrans Pump Stations Upgrades
Owner: State of California, Department of Transportation
Date of Completion: March 2022
Contract Amount: $4,639,700.00
Contact: David Carruba (559) 974-5337
Replacing the existing switchgear and low voltage motor control center at City College Reservoir. This work consists of removing the existing switchgear, motor control centers, PLC, conduit and conductors and all appurtenances. Mechanical work including removal of existing regulating valve, motor operated butterfly valve, spool pieces, and hydraulically operated butterfly valve. Installation of new altitude valve, butterfly valve, spool pieces, and pipe supports. Removal and reinstallation of existing staircase, Connection of the new altitude valve to the existing reservoir, drain, and PLC. Mechanical work also includes the installation of four new MOVs.
City College Reservoir Electrical Improvements
Owner: City of Sacramento Department of Utilities
Date of Completion: March 2022
Contract Amount: $546,000.00
Contact: Paul Barnes (916) 808-1442
Install pre-engineered metal building, diesel generator, fuel tank, electrical feeder conduit and electrical fixtures on pre-existing buildings (Project A) and install ground-mounted solar array and appurtenances (Project B).
Malakoff Diggins SHP - Site Improvements & Solar Power Generator
Owner: California Department of Parks and Recreation
Date of Completion: Feb 2021
Contract Amount: $1,175,000.00
Contact: Phil Hock (916) 812-7280
Fabrication and Installation of aluminum tread plate covers on the chlorine contact basin and sand filter influent troughs. The covers consisting of a 3/16" 6061 aluminum tread plate surface and the bottom side having a 2x2x1/4" aluminum angle welded transversely at 24" spacing. The 2x2 angle sitting on a 2x2 angle that is drilled and epoxied into the existing concrete trough. The tread plate to be flush with the top angle that is drilled and epoxied into the existing concrete. Each fabricated section 42" wide by 48" long. Each panel weighing about 50 lbs.
Installation of Basin Covers the Chlorine Contact Basin & Sand Filter at Wastewater Treatment Plant
Owner: City of Nevada City
Date of Completion: April 2021
Contract Amount: $63,000.00
Contact: Bryan McAlister (530) 559-1326
Excavation of approximately 100 feet for utility trench, installation of conduits and wires, pull boxes, 2 automatic transfer switches, connections to the existing generator and existing building panels, pavement restoration, and project area restoration.
NTPUD Base Facilities Emergency Power Distribution System
Owner: City of Nevada City
Date of Completion: Oct 2020
Contract Amount: $60,500.00
Contact: Bryan McAlister (530) 559-1326
Complete water cleaning and maintenance at Nevada City Water Treatment Plant
Water Reservoir Cleaning & Maintenance at Water Treatment Plant
Owner: City of Nevada City
Date of Completion: Oct 2020
Contract Amount: $60,500.00
Contact: Bryan McAlister (530) 559-1326
Remove sediment and temporary stockpiled sediment from Loma Rica Reservoir. Coordinate with airport manager to ensure the safety of the public, flight activities , and plane taxiing.
NID Reservoir Sediment Removal Project
Owner: Nevada Irrigation District
Date of Completion: 10/15/19
Contract Amount: $264,094.00
Contact: Adrian Schneider (530) 271-6839