Construct a 2800 gpm well pump with associated building, roadway, fencing, drainage, paving, piping and chemical treatment, and supply pipeline including connections to the existing system.
Well 15 Pump Station
Owner: Rio Linda/Elverta Community Water District
Date of Completion: March 2013
Contract Amount: $1,263,310.28
Contact: Sara Rogers (916) 933-1997
Modification of the existing deep wells 4D & 11D. Remove existing pump & motor on Well 4D, install new pump & motor, install variable frequency drive, new electrical panel, modification of electrical panel, install new automatic transfer switch, and associated changes in electrical wiring. Remove existing pump and motor on Well 11D, conversion from oil to water lubricated pump, install new pump and owner furnished motor, install variable frequency drive, new electrical panel, modification of electrical panel, install new automatic transfer switch and associated changes in electrical wiring.
Wells 4D-11D Upgrade
Owner: Florin Resource Conservation District (Elk Grove Water District)
Date of Completion: March 2013
Contract Amount: $427,886.00
Contact: Bruce Kamilos (916) 585-9385
Construct sand house building at the Tahoe City Caltrans maintenance yard.
Construct Sand House at Tahoe City Maintenance Yard
Owner: State of California, Caltrans, Department of Transportation
Date of Completion: December 2012
Contract Amount: $606,742
Contact: Jimmer Ross (530) 701-4595
Transition piping and valving required to extend the existing 16” HDPE sanitary sewer dual force main into one 18” fusible PVC force main using the existing 24” CMP gravity sewer line. Replace existing package lift station with a new 200 GPM package lift station, including a new control panel and electrical gear.
North Market Force Main Extension & Auditorium Drive Lift Station Replacement
Owner: City of Redding
Date of Completion: December 2012
Contract Amount: $796,435.86
Contact: Ron DeMaagd (530) 225-4170
Furnish and install gallery lighting in N12 building lobby, install an auto-transfer switch for the N2 generator, and install additional campus site lighting.
Sierra College-Nevada County Campus N2-N12 Site Lighting
Owner: Sierra Joint Community College-Nevada County Campus
Date of Completion: November 2012
Contract Amount: $83,859.10
Contact: Donna Brazil-Bloche (530) 274-5327
Removal of existing generator and installation of a new larger 500 kw generator to a newly prepared site. Installation of a new electrical fire pump into a newly constructed fire pump room in the basement. Demolition, concrete, underground electrical and panel fencing.
MaQuarrie Hall Emergency Generator & Fire Pump Installation
Owner: San Jose State University, State of California
Date of Completion: September 2012
Contract Amount: $604,370.65
Contact: Mike Ham (408) 924-1972
Construct and install 4 metal canopies at 4 different Caltrans yard locations.
4 Metal Canopies Installation
Owner: State of California, Caltrans, Department of Transportation
Date of Completion: March 2012
Contract Amount: $367,136
Contact: John Alameda (916) 859-7962
Furnish and install a new 150-Ampers, 120/208-Volt, three Phase, circuit breaker in Armory main switch board. Furnish and install new panel boards and new pole mounted flood lights. Remove existing underground duct bank including conduits, power cables from three power operated gates and the Fence Obstruction lights to the electrical room at operation center. Furnish and install new underground duct bank including conduit, power cables for the existing three power operated gates, fence obstruction lights, single mode fiber cable for telephone and new panel board. Furnish and install new 100-Ampere, 120/208, three Phase manual transfer switch. Trenching, back filling, landscape modification and restoring and asphalt pavement patching.
Mather AASF Fuel Farm Electrical Upgrade
Owner: State of California Military Department
Date of Completion: January 2012
Contract Amount: $515,151
Contact: Garth Page (916) 854-3528
Site preparation, excavation, demolition, construction of sanitary sewage submersible pump station, generator, motor control center, valve vaults, trenching, meters, placement of pipe, fittings and other related items.
Secline Pump Station Rehabilitation
Owner: North Tahoe Public Utility District
Date of Completion: November 2011
Contract Amount: $648,733.20
Contact: Suzi Gibbons (530) 546-4212
Tear down existing sand house and replace with new metal building sand house. Demolition, excavation, concrete, electrical and iron work.
Sand House at Castle Peak
Owner: State of California, CalTrans, Department of Transportation
Date of Completion: November 2011
Contract Amount: $652,410
Contact: Tim Crosby (530) 320-6460
Construction of a new vehicle storage building, one story, pre-engineered metal building, 3200 sq ft unconditioned area, 16 ft eave height.
County of Sierra
Owner: Alleghany Public Services Building
Date of Completion: September 2011
Contract Amount: $113,058.09
Contact: Bryan Davey (530) 289-3201
Installation of flashing beacons, modify ramp metering and modify signals, construction area signs and traffic control system. Work was done at various locations in Sacramento County, Yolo County and El Dorado County.
Flashing Beacons & Modify Signals
Owner: State of California, Caltrans, Department of Transportation
Date of Completion: August 2011
Contract Amount: $116,300
Mohan Chohan (916) 263-4922
Clearing and grubbing, grading, erosion and sediment control, wet and dry utilities, landscaping, concrete work, play structures, lighting and other park related improvements.
Loomis Downtown Park
Owner: Town of Loomis
Date of Completion: June 2011
Contract Amount: $455,604.17
Contact: Brian Fragiao (916) 652-1840
Install an electrical circuit panel, isolation transformer, electrical wiring, receptacles, halo ground ring, grounding to equipment racks, and back-up generator hookups in the radio room.
Radio Communications Room Electrical Project
Owner: Yolo Emergency Communications Agency
Date of Completion: June 2011
Contract: $22,422.25
Contact: Karen Avara (530) 666-8900
Construction of a reinforced concrete foundation with dish antenna pipe masts, grounding system and associated conduit work at the Placer County Comm/IT Building.
IT Satellite Dish Foundation Construction
Owner: Placer County
Date of Completion: June 2011
Contract Amount: $16,290.88
Contact: Bob Bigney (530)889-4255
Replace sewer trunk line, lateral and manhole at three various locations.
Annual Sewer Rehabilitation and Replacement
Owner: City of Woodland
Date of Completion: June 2011
Contract Amount: $145,859.38
Contact: Tami Burnham (530) 661-5961
Install two state supplied transformers, state supplied main switchgear, state supplied secondary switchgear, remove interim 5kv panel board with meter, relocate and connect electrical feeder cables for the 64-bed project from the 5kv interim panel board to the new secondary switchgear, and all other required components (contractor supplied) of the electrical distribution system, as well as procuring, installing, terminating, and testing all primary side of the new transformers.
California Medical Facility Vacaville Transformer and Switchgear Install
Owner: California Department of Corrections and Rehabilitation
Date of Completion: June 2011
Contract Amount: $494,382
Contact: Pete Regan (916) 255-3083
Installing rectangular tube steel along the back of the tipping wall, installing a structural concrete grade beam with short round tube steel posts in front of the existing steel posts, replacing/repairing a bent tall steel post, sandblasting and recoating all steel members, epoxy injecting cracks in concrete wall, repairing spalls, installing downspout and resurfacing an area of asphalt.
Foresthill Transfer Station Tipping Wall Repair
Owner: Placer County
Date of Completion: April 2011
Contract Amount: $68,386
Contact: Heather Knutson (530) 886-4987
Sealing 24 filter under-drain pipe penetrations and replacing approx. 810-feet of expansion joint seals throughout the north and south filter basins. Repair of the pipe penetration seals includes but is not limited to removal and replacement of filter media and support plates, welding new caps on the pipe penetrations, replace bolts and applying a coating system. Expansion joint replacement includes but is not limited to removing the existing joint materials on the horizontal surfaces and corners and replacing that material with a new foam joint filler material.
San Juan Water Treatment Plant Filter Repair
Owner: San Juan Water District
Date of Completion: April 2011
Contract Amount: $214,847.23
Contact: Tony Barela (916) 791-6939