Grading, Foundation, Metal Building 30’x50’, Electrical, Fire Alarm, Paving.
Sheriff's Boat Barn
Owner: Placer County Facility Services Department
Date of Completion: July 2008
Contract Amount: $139,678
Contact: Bill Lardner (530) 886-4983
Decorative Gates 25’- 28’, Install Hysecurity Gate Operators, gate loop detectors, underground electrical, install street light pole for security camera mounting including pole, foundation and pull box, removal of fencing and install new 8’ rod iron decorative fencing and 9’ decorative fence pilasters, concrete curb and gutters.
Security Gate Upgrades
Owner: City of Yuba City
Date of Completion: July 2008
Contract Amount: $347,256
Contact: Mandeep Chohan (530) 822-7448
Plans, permit, construction of a 24’x24’ metal garage style metal building. Including relocation of existing propane gas line, underground electrical service for new building, concrete footings and slab, unit heater, painting, electrical and lighting.
Nevada County Sheriff’s Property Unit Garage
Owner: Nevada County
Date of Completion: March 2008
Contract Amount: $37,074
Contact: Mike Quintana, Facilities Project Manager (530) 470-2639
Sixteen Radar Signs at various locations throughout Nevada County
Nevada County Radar Signs
Owner: Nevada County Transportation
Date of Completion: March 2008
Contract Amount: $97,992
Contact: Jim Orendorff (530) 265-1428
Grading, Concrete Foundation, Sprinkler System.
Sacramento Metal Health
Owner: ACCO Engineered Systems
Date of Completion: March 2008
Contract Amount: $23,852
Contact: Robert Whitney (916) 360-5691
Demo Boiler and duct work in mechanical room, Build new roof top boiler pad, Miscellaneous reinforcing steel.
Sacramento DOT
Owner: ACCO Engineered Systems
Date of Completion: March 2008
Contract Amount: $40,878
Contact: Robert Whitney (916) 360-5691
Raising of existing house two feet to accommodate new framing. Concrete foundation and piers, and relocation of existing utilities.
Raising of House for New Foundation
Date of Completion: December 2007
Contract Amount: $17,020
Owner & Contact: Mark Miller (530) 265-1351
Capping fill pressure-dosed septic system design for a 3 bedroom home and grading including driveway, house pad, clearing on a property located on a hillside
Septic System and Grading – Nevada County
Date of Completion: November 2007
Contract Amount: $56,900
Owner & Contact: Constance and Chuck Terzella
New Hanger-Metal Building 40’x60’ to replace existing hanger located at the Nevada County Airport
However, due to the owner no longer needing the building, they requested the cancellation of the contract. Koch Excavating Inc. was able to contact Heritage Building Systems and receive a full refund for Mr. Kaul. Mike Kaul requests anyone considering Koch Excavating, Inc. (Koch & Koch, Inc.) for a project, to give him a call.
Hanger at Nevada County Airport
Date: October 2007
Cancelled by Owner
Contact: Mike Kaul (530) 273-8489
A general upgrade of the existing Lift Station, replacement of two existing lift pumps and pump control panels with larger capacity pumps and control panels, adjustment of the float switch control set depths, preparation of a wiring diagram, bypass the wet well and keep the sanitary sewer operational during construction.
Olympus Village Sewer Lift Station Upgrade
Owner: County of Placer Facility Services Department
Date of Completion: September 2007
Contract Amount: $101,277
Contact: Hope Bostic (530) 886-4928
Lower Manhole on Quaker Hill Road, Nevada City
Nevada County Manhole Repair
Owner: Nevada County Transportation
Date of Completion: February 2007
Contract Amount: $1,625
Contact: Jim Orendorff (530) 265-1428
24” Storm Drain Pipe, Flat slab manhole with grate top, remove and replace concrete curb and gutter and restoration of existing improvements.
Glide Ave Storm Drain Improvement Project
Owner: City of West Sacramento
Date of Completion: September 2005
Contract Amount: $70,482.98
Contact: Lenard LaChappell (916) 617-4645
1.5” and 4” PE Service lateral inside existing 6” steel pipe, 1” and 1.5” service lateral, fire hydrants 6“ valve, joint trench, single and double water services, 4” water main, AC pavement, rock excavating, road crossings.
Donner Lake Pipelines
Owner: Truckee Donner Public Utility District
Date of Completion: July 2005
Contract Amount: $451,265
Contact: Neil Kaufman (530)587-3896
Installed Automated Weather Observing System. Excavation, keystone retaining wall, concrete footings and slab, electrical, install tower.
AWOS III Installation
Owner: Nevada County Airport
Date of Completion: June 2005
Contract Amount: $118,213
Contact: Jim Orendorff (530) 265-1428
Grading of Roads and Parking Area, Septic System, Concrete Foundation.
The Salvation Army Camp Del Oro – Nevada City
Owner: Salvation Army
Date Completed: November 2004
Contact: Lloyd Mathison, Salvation Army Camp Manager (530) 478-0277
Replaced and upgraded a treated water pump station. Earthwork and site preparation, 6” mainline, concrete work dismantle existing pump station, shoring, stone slope protection, electrical service upgrade, landscaping.
Jayhawk Pump Station Replacement
Owner: Nevada Irrigation District
Date of Completion: July 2004
Contract Amount: $289,722
Contact: Vern Smith, Supervising Engineer (530) 271-6862
This project involved the demolition and reconstruction of the existing 890 sq ft dwelling. Excavation, concrete foundation and flatwork, complete framing, electrical, plumbing and mechanical. This house was a turn key project, allowing the owner to choose all finished coverings from the cabinets, paint color and carpet to the appliances.
Community Development Block Grant
Owner: City of Grass Valley
Date of Completion: July 2004
Contract Amount: $122,785
Contact: Home Owner – Jackie Pitts (530) 273-5352
Site Preparation, underground utilities, storm drain outlet, septic system, footings for sound wall, 4” fire line, concrete trash enclosure, erection of steel office building and prefabricated metal roofing and siding. Placed 1,100 tons of Asphalt paving for parking lot.
New Maintenance and Administration Facility for Durham Transportation and School Services
Date of Completion: July 2004
Contract Amount: $490,493
Contact: Kimmel Construction Inc. – Gary Link (916) 718-6649
Eleven Nested “T” Hangers, 12,986 sq ft, 54’x259’ steel building and prefabricated metal roofing and siding with electrically operated Bi-fold Doors. Concrete Foundation with a vapor barrier and asphalt aprons.
Nevada County Airport Hanger Project
Owner: Airport Hanger Association
Date of Completion: 2004
Contract Amount: $383,500
Contact: Joe Weathers (530) 477-2807